AGRICULTURE

No. Project Title Description Status Indicative budget (USD milion)
1 Irrigation Development Project in the Rovuma River Basin (Cabo Delgado and Niassa Provinces) Construction/Rehabilitation of irrigation infrastructures (50.000 ha) Pre-feasibility study available 702
2 Irrigation Development Project in the Lúrio River Basin (Cabo Delgado, Niassa, Nampula and Zambézia Provinces) Construction/Rehabilitation of irrigation infrastructures (20.000 ha) Pre-feasibility study available 280.8
3 Irrigation Development Project in the Licungo River Basin (Zambézia Province) Construction/Rehabilitation of irrigation infrastructures (10.000 ha). Pre-feasibility study available 140.4
4 Irrigation Development Project in the Zambeze River Basin (Manica, Sofala, Tete, Zambézia Provinces) Construction/Rehabilitation of irrigation infrastructures (10.000 ha) Pre-feasibility study available 1,263

ENERGY

No. Project Title Description Status Indicative budget (USD milion)
1 Hydropower Station (Zambézia-Alto Malema) Construction of an hydropower plant (capacity of 60 MW) Feasibility study available 150
2 Hydropower Plant (Nampula-Lúrio) Construction of an hydropower plant (capacity of 120 MW) Feasibility study available 400
3 Mphanda Nkuwa Hydropower Plant (Chiúta – Tete) Construction of an hydropower plant (capacity of 1500MW) Feasibility study available 2.600
4 Cahora Bassa Norte Hydropower Plant (CHB NORTH, Cahora Bassa – Tete) Construction of an hydropower plant (capacity of 1245 MW) Pre-feasibility study available & feasibility study in progress 124
5 Alto Malema Hydropower Plant (Gurúè – Zambézia) Construction of an hydropower plant (capacity of 50 MW) Pre-feasibility study available & feasibility study in progress 124
6 Berua Hydropower Plant Construction of an hydropower plant (capacity of [25 MW;: 42 MW]) Pre-feasibility study available & feasibility study in progress 120
7 Massingir Hydropower Plant Construction of an hydropower plant (capacity of 25 MW) Pre-feasibility study available & feasibility study in progress 67
8 Mozambique National Transmission (SNT, Tete -Maputo) Setting up a Transmission Line Feasibility study available 1,870
9 Benga Coal Thermic Central Construction of a coal-fired thermal power plant (capacity of 450 MW) Pre-feasibility study available & feasibility study in progress 1,300
10 Moatize Coal Thermic Central Construction of a coal-fired thermal power plant (capacity of 600 MW) Pre-feasibility study available & feasibility study in progress 1,500

HYDRAULIC INFRASTRUCTURE

No. Project Title Description Status Indicative budget (USD milion)
1 Mapai Dam (Gaza Province) Construction (capacity of 6.000 million m3) Feasibility study in progress 1.00
2 Luatize-Lugenda Dam (Niassa Province) Construction (capacity of 300 million m3 ) Feasibility study in progress 0,3
3 Mussengue Dam (Mecula/Niassa Province) Construction (capacity of 400 Million m3) Feasibility study in progress 0,4
4 Megaruma Dam (Ancuabe/Cabo Delgado Province) Construction (capacity of 130 million m3) Preliminary study available 0,18
5 Lurio Dam (Namapa/Nampula Province) Construction (capacity of 600 Million m3) Preliminary study available 0,6
6 Mugeba Dam (Mocuba/ Zambeze Province) Construction (capacity of 200 Million m3) Feasibility study in progress 0,4
7 Mutala Dam (Alto Molocue/Zambeze Province) Construction (capacity of 600 Million m3)Delgado Pre-feasibility study in progress 0,35
8 Chipembe Dam (Montepuez / Cabo Delgado) Rehabilitation (capacity of 25 Million m3) 0,125
9 Revubue Dam (Moatize/Tete Province) Rehabilitation (capacity of 120 Million m3 ) Feasibility study available 0,25
10 Nhancangara Dam (Barue/Manica Province) Rehabilitation (capacity of 60 Million m3) Feasibility study available 0,16
11 Luia Dam (Chifunde/Tete Province) Rehabilitation (capacity of 4300 Million m3) Feasibility study available

TRANSPORTATION INFRASTRUCTURE

No. Project Title Description Status Indicative budget (USD milion)
1 Machipanda Railway Line Rehabilitation 200
2 Industrial Park Construction of industrial units- 2,500 hectares 324
3 Bus Rapid Transit (Maputo) Construction 225
4 Dry Port (UTE, Niassa) Construction of a dry port (including warehouses, container terminal, truck park and other support infrastructures) 200
5 Dock 11 & Fertilizer Terminal (Port of Beira, Sofala) Construction of the piers 11a and piers 11b & construction of a fertilizer terminal in the Port of Beira 869
6 Nyamayabwe Mutuali Railway Line (Tete, Zambézia and Nampula) Construction-440 kms 2,080
7 Railway Line Mutarara Branch – Vila Nova da Fronteira – Blantyre (Tete to Malawi) Rehabilitation 939

TOURISM SECTOR

No. Project Title Description Status Indicative budget (USD milion)
1 Inhassoro Anchor Project (Inhambane province) Hotels, villas, chalets, golf course, marina and shopping centre along the beach-2,750 hectares Feasibility study available & DUAT 200
2 Vilankulo Resort (Inhambane Province) Construction of 40 eco-houses, 20 beach-houses, 3 beach bar modules, 3 spas, gym modules, restaurants, conference rooms along the beach-6 hectares Feasibility study available & DUAT 20
3 Inhassoro Hotel (Inhambane Province) Construction of terraced and isolated houses, restaurants and support services along the beach-4 hectares Feasibility study available & DUAT 20
4 Business Hotel (Pemba) Construction of 128 rooms with restaurants along the beach-1.400m2 Feasibility study available & DUAT 10
5 Dobela Eco-Resort (Maputo Special Reserve) Construction of an hotel (4 stars, conference rooms), front beach villas and a mall (convenience stores, restaurants, bank branches)-1,500 hectares Feasibility study available & DUAT 12